Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\akam.com\httpdocs\website\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the translatepress-multilingual domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\akam.com\httpdocs\website\wp-includes\functions.php on line 6114
SIRS Compliance Deadline — What's Required by 12/31/24? - AKAM

Fecha límite de cumplimiento de SIRS: ¿Qué se requiere antes del 31/12/24?

A medida que se acerca el último trimestre del año, es esencial mantenerse al tanto de los últimos requisitos para los Estudios de Reserva de Integridad Estructural (SIRS). El jueves 25 de julio, Will Simons, RS, EBP de Association Reserves se unió a AKAM para brindar una descripción general completa de los próximos plazos de cumplimiento, profundizar en los requisitos específicos que debe cumplir y ofrecer orientación práctica para garantizar que esté completamente preparado antes del 31 de diciembre de 2024.

Los panelistas incluyen:

– Will Simons, RS, EBP, Presidente, Reservas de la Asociación

– Doug Weinstein, vicepresidente senior de operaciones, AKAM Southeast

Moderado por David Ward, Director de Desarrollo Comercial de AKAM, Sudeste.

Solicitud de propuesta (actualización de RFP)

¿Es usted cliente de AKAM?*(Requerido)
Términos(Requerido)
es_ESSpanish